Dalaman Airport International Terminal
-
2018
Dalaman International Airport New Terminal Building was completed and put into service in July 2018.
In the project designed as exposed concrete, mineral-based potassium sol-silicate KEIM Concretal Lasur, which preserves the natural, matte appearance of the concrete, eliminates the defects in the concrete by preserving the concrete character, provides the desired aesthetic finish while protecting the concrete at the same time, has dust-proof and consolidation properties, was preferred.
Photos: yda.com.tr