Anadolu Isuzu Automotive Kocaeli Manufacturing Facility
-
2014
RÖDER T-Line Series Industrial Tent Systems were preferred at Anadolu Isuzu Automotive Kocaeli Manufacturing Facilities. 2 tent systems built with steel truss construction for storage purposes, with 20 and 10 meters of clear span, 40 and 35 meters of length and 6.20 meters of side height, were established on an area of 1150 m².
The project, which took two weeks to install, was delivered on a turnkey basis with concrete floor, basic lighting, ventilation, emergency exit and high-speed PVC door applications. In the project, sandwich panels filled with rock wool were applied on the side facades.