New Generation Products of BTM were Preferred in Antalya Eastside Garage Culture and Trade Center Project
Before the application of BTMSEAL PUrea H2 spray Hybrid Polyurea, surface cleaning and wiping, grouting around the expense area and repairing mortar were applied to the concrete joints. Then BTMSEAL AA0106 Epoxy Based Solvent Free Transparent Impregnation Primer was applied to the surface with the help of roll and check rust and sprinkled with silica sand. One day later, silica sands that were not attached to the liner were swept and BTM Purea H2 Hybrid Polyurea was applied. Then, felt and XPS were placed on the pebble paving process was completed. Aliphatic UV resistant polyurethane paint was applied on surfaces exposed to UV (parapet, etc.).